plop SPACEPHOTOS
 Untitled Document




   Home » Ref S11131 (detail)

 
My Light Box / Estimate Request : 0 image(s)
Alternate choice of images for this theme
                        
Save this image free of charge
in 800 pixels for layout use
(right click, Save as...)



Ref : S11131

Theme : Space Shuttle - Landing  (358 images)

Title : With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building

Caption :

(01/22/1997) -- With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building (VAB) on the right, the Space Shuttle orbiter Atlantis approaches Runway 33 at KSC’s Shuttle Landing Facility for a scheduled touchdown at about 9:23 a.m. EST Jan. 22. When the orbiter lands, it will conclude the fifth Shuttle-Mir docking mission and return NASA astronaut John Blaha to Earth after four months in space. At main gear touchdown, the STS-81 mission duration will be 10 days, 4 hours, 55 minutes. This is the 34th KSC landing in Shuttle history. Mission Commander Michael A. Baker is steering Atlantis to a perfect landing, with help from Pilot Brent W. Jett, Jr. Other returning STS-81 crew members are Mission Specialists John M. Grunsfeld, Peter J. K. 'Jeff' Wisoff and Marsha S. Ivins. Atlantis also brought back experiment samples from the Russian space station Mir for analysis on Earth